• Products

    Deep Expertise in R&D and Manufacturing | International-Standard Quality Control | Customized Solutions | Serving Global Infrastructure and Environmental Initiatives

LLDPE Textured Geomembrane
  Warranty   1 Year
  After-sale Service   Online technical support
  Project Solution Capability   total solution for projects
  Application   Outdoor
  Design Style   Industrial
International Compliance & Quality
Robust Performance Across All Scenarios
On-Demand Customization
Stable Batch Delivery
View Quote >

Product Description


No.ItemIndex
0.50 mm0.75 mm1.00 mm1.25 mm1.50 mm2.00 mm2.50 mm3.00 mm
1Asperity Height (mm)0.25
2Density (g/cm³)≤ 0.939
3Tensile Properties

Tensile Strength (Stress) (N/mm)59111316212631

Elongation at Break (%)250

2% Secant Modulus (N/mm)2103704205206308401 0501 260
4Trapezoidal Tear Strength (N)5070100120150200250300
5Multi-axial Tensile Strain at Break (%)30
6Puncture Resistance (N)100150200250300400500600
7Environmental Stress Crack Resistance (hr)1 500
8Carbon Black

Carbon Black Content (Range) (%)2.0~3.0

Carbon Black Dispersion9 out of 10 observation areas shall be Grade 1 or 2, and no more than 1 occurrence of Grade 3
9Oxidative Induction Time (OIT)

Standard OIT (min) or100

High Pressure OIT (min)400
10UV Resistance

Retention of High Pressure OIT after 1 600 h UV Irradiation (%)35
1185℃ Oven Aging (Minimum Average Value)

Retention of Standard OIT after 90 d Oven Aging (%) or35

Retention of High Pressure OIT after 90 d Oven Aging (%)60
12-70℃ Low Temperature Impact Brittleness ResistancePass
13Water Vapor Permeability Coefficient (g·cm/(cm²·s·Pa))≤ 1.0×10⁻¹³
14Dimensional Stability (%)±2

Product Show

土工膜拼图


Project Case Studies

Hydraulic Engineering

Riverbank Slope Protection Project

Riverbank Slope Protection Project

Hydraulic Engineering

Artificial Lake Anti-Seepage Project

Artificial Lake Anti-Seepage Project

Salt Field Drying

Seaside Salt Drying Field

Seaside Salt Drying Field

Landfilling

Landfill Liner Systems

Landfill Liner Systems

Waste Landfilling

Solid Waste Landfill Project

Solid Waste Landfill Project

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 18266448692
Submit Consultation Request

Related Products